Project Templates let you define a standard configuration for your daily reports, survey questions, email recipients, and more — then apply that configuration to any project in your account. Set up a template once and roll it out to new or existing projects in seconds.
Quick Answer
To create or edit a project template:
Go to Company > Project settings > Project templates
Click + Project template to create a new one, or click the ellipsis (…) on an existing template and select Edit
Configure each section, click Save, then apply to projects using ellipsis (…) > Apply to projects
How to Access Project Templates
Log into the Raken web app. Click Company in the left side navigation. Click Project settings to expand it, then click Project templates.
How to Create a New Template
Click the green + Project template button in the top right corner. Enter a Template name. Toggle on Make this my default template if you want this template to apply automatically to all new projects. Click Save, then continue configuring the remaining sections.
How to Edit an Existing Template
Click the ellipsis (…) to the right of any template name and select Edit. Work through each section in the left navigation and make your changes. Click Save after updating each section.
Template Sections
Info
Set the Template name and toggle whether this is your Default template. The default template (marked with a ★) is automatically applied when a new project is created.
General
Configure project-wide display and reporting settings:
Date display — choose Month/Day/Year or Day/Month/Year
Required report frequency — set how often daily reports are required (e.g., Daily/Weekly) and which days
Project radius — set a default geofencing radius for projects using this template
Weather capture times — set up to three times per day for automatic weather data capture, and choose your preferred units (°F/°C, MPH/KPH, in/mm)
Report display language — set the language for daily report display
Daily Report
Select which sections appear on the daily report PDF. Options are organized by category:
Daily logs: Weather, Work log hours, Work log quantity, Work log descriptions, Total hours to date, General notes, Daily survey, Photo date/time stamps, Entry date/time stamps, Hide empty sections
Safety and quality: Site safety notes, Quality control notes, Toolbox talks, Completed checklists
Production: Time cards, Material quantity, Production, Equipment
Collaborator's reports: Hide inactive collaborators, Hide empty collaborator reports, Hide superdaily grand totals
Survey Questions
Add, remove, and reorder the survey questions that appear on the daily report. Use the My company tab to set questions for your own team's reports, and the Subcontractors tab to set questions for collaborator reports. Drag rows to reorder. Click + to add a new question — select a category and type your question text.
Note: Survey question changes applied to existing projects take effect on the following day, not immediately.
Email Recipients
Set who automatically receives the completed daily report by email:
When to send — choose Send as soon as it's signed or Send at a specific time each day
Internal recipients — people within your company who receive the full daily report including Time Cards and Super Daily
External recipients — owners, executives, or other external contacts who receive a high-level report. You can choose to include Time Cards, Super Daily Index, Material quantity, and Equipment for external recipients
Watermark
Enable watermarks on mobile photos and configure what information appears on each watermarked image:
Include company logo
Include company name
Include project name
Include timestamp
Include GPS coordinates
Include auto-generated location
Watermark alignment — choose where the watermark appears on the photo (e.g., Bottom Left)
How to Apply a Template to Existing Projects
Saving a template does not automatically update existing projects — it only affects new projects created with that template going forward. To push changes to existing projects:
Go to Company > Project settings > Project templates
Click the ellipsis (…) next to the template and select Apply to projects
Select the projects you want to update
Click Apply
Note: Survey question changes take effect on the following day for the applied projects. All other settings apply immediately.
Troubleshooting & FAQ
Can I have more than one project template?
Yes — you can create as many templates as you need. Only one can be set as the default, which applies automatically when new projects are created.
What does the default template (★) do?
The default template is automatically applied when a new project is created. You can still select a different template at the time of project creation if needed.
Can I copy an existing template?
Yes — click the ellipsis (…) next to a template and select Duplicate to create a copy you can then edit.
Will changes to a template automatically update existing projects?
No — changes to a template only apply to new projects going forward. To update existing projects, use ellipsis (…) > Apply to projects and select the projects you want to update.
When do survey question changes take effect after applying to projects?
Survey question changes take effect on the following day for applied projects — not immediately.
Technical Specifications
Compatibility: Web app only
Plan Required: All plans
Role Required: Account Administrator
Considerations
Templates only affect new projects automatically — use Apply to projects to update existing ones.
Survey question changes applied to existing projects take effect the following day.
Only one template can be set as the default at a time.
Project radius set in a template becomes the default for all new projects using that template — it can still be adjusted at the project level.
Related Articles
More Questions?
Feel free to email us or call us at +1 866-438-0646. We're always glad to answer your questions!
