Skip to main content

How to Customize Daily Report Sections in Raken

In this article, learn how to customize which sections appear on your Raken daily reports at the project level and company template level.

Written by Carolina Manos

Not every project needs the same daily report. Raken lets you choose exactly which sections appear on your completed daily reports — so your team only sees and captures what's relevant to each job. This article explains how to customize report sections at the project and company template level.


Quick Answer

To customize which sections appear on your daily reports, go to Projects > [Your Project] > Settings > Daily Reporting > Daily report. Check or uncheck the sections you want to include or hide, then click Save.


Available Report Sections

Daily reports are organized into four groups. You can toggle each option on or off:

Daily Logs

  • Weather — displays weather captured at the project location as the report header

  • Work log hours — displays total man hours with the work log

  • Work log quantity — displays total number of employees associated with the work log

  • Work log descriptions — displays the description of the work log

  • Total hours to date — displays cumulative hours logged for the project

  • General notes — displays any general notes logged for the day

  • Daily survey — displays responses to the daily survey questions

  • Photo date / time stamps — displays the date and time stamp on photos

  • Entry date / time stamps — displays the date and time stamp for text entries

  • Hide empty sections — hides sections with no data from the report PDF

Safety and Quality

  • Site safety notes — displays any site safety notes logged

  • Quality control notes — displays any quality control notes logged

  • Toolbox talks — appends completed toolbox talk reports to the daily report

  • Completed checklists — appends completed checklists to the daily report

Production

The sections below require the Performance Plan to have data — Time Cards, Production Tracking, and Equipment Management are all Performance-only features, so these toggles have nothing to display on a Basic plan account.

  • Time cards — displays employee time card details

  • Material quantity — displays basic quantities and totals of materials consumed

  • Production — displays an in-depth breakdown of materials and time cards by cost code

  • Equipment — displays an overview of equipment deployed on the project

Collaborator Reports

  • Hide inactive collaborators — hides pages for collaborators who have not contributed

  • Hide empty collaborator reports — hides pages for collaborators with no data for the day

  • Hide Super Daily grand totals — hides the combined man hours and employee count totals for internal and collaborator work logs


How to Customize at the Project Level

  1. Log into the Raken web app.

  2. Click Projects and select your project.

  3. Click Settings in the left side menu, then select Daily Reporting.

  4. Click the Daily report tab.

  5. Check or uncheck sections as needed.

  6. Click Save in the top right corner.


How to Customize at the Company Template Level

To apply the same configuration across multiple projects, update a Project Template and push it to your projects.

  1. Log into the Raken web app.

  2. Click Company, then select Project templates.

  3. Click the ellipsis (…) next to the template and select Edit.

  4. Navigate to the Daily Report section and adjust the sections as needed.

  5. Click Save.

  6. Return to the templates list, click the ellipsis, and select Apply to projects. Choose your projects and click Apply.


Troubleshooting & FAQ

My changes aren't showing on today's report — why?

Changes to report sections take effect the following day. If you saved the setting today, it will appear on tomorrow's daily report.

Can I set different report sections for different projects?

Yes. Report sections are configured per project. Each project can have its own custom section settings independent of others.

I'm on the Basic plan — why don't the Time cards, Production, or Equipment sections show anything?

Time Cards, Production Tracking, and Equipment Management are all Performance Plan features. The toggles for these sections still exist in settings, but there's nothing for them to display on a Basic plan account since those underlying features aren't available. Basic plan accounts use Work Logs for hours tracking instead.


Technical Specifications

  • Compatibility: Web app only

  • Offline Capability: No — requires an active connection

  • Plan Required: All plans for section customization overall; the Time cards, Production, and Equipment sections specifically require the Performance Plan to have any data

  • Role Required: Account Administrator or Project Administrator


Considerations

  • Report section changes take effect the following day — plan ahead.

  • Applying a template updates all report settings for the selected projects — review the full template before applying to avoid unintended changes.

  • Production and Equipment sections only display data if your team is actively logging those entries in Raken — and both require the Performance Plan.

  • The Time cards section also requires the Performance Plan — Basic plan accounts use Work Logs for hours instead.


More Questions?

Feel free to email us or call us at +1 866-438-0646. We're always glad to answer your questions!

Did this answer your question?